DCC test

Data Centre & Cloud Presentation

Issue link: https://www.rogers.com/business/blog/i/1412165

Contents of this Issue

Navigation

Page 20 of 29

21 Data centre features Rogers Data Centre & Cloud services • N+1 cooling redundancy • Redundant computer- controlled compressors, hot aisle/cold aisle containment and humidity-control systems • Perforated cabinet doors for temperature control Power backup Sophisticated security Network redundancy Fire suppression Redundant cooling system • N+1 power redundancy • Redundant uninterrupted power supply (UPS) systems • High-capacity continuous run diesel generators with fuel for a minimum of 24 hours of operation • Unmarked facilities with single secure entrances for customers and staff • Two-stage authentication process at all facilities, including biometric authentication, such as iris scanners, at most facilities • Individually locked cabinets • 24/7 interior and exterior low-light CCTV camera monitoring • Nationwide fibre network, including access points in the U.S. and overseas • Multi-homed network with extensive peering and Tier 1 transit providers • Two-stage, pre-action dry pipe sprinkler system and/or gas suppression (extinguishes fire without water)

Articles in this issue

view archives of DCC test - Data Centre & Cloud Presentation